Lecturer In-charge听 : Prof.J.M.S.J.Bandara
Technical Officer听听听听 : Mrs. G.A.N. Gurusingha
Facilities
|
Equipment / Software |
Application |
|
Manual Traffic Counters |
Traffic Counts, Turning Movement Counts |
|
Radar Guns |
Speed Surveys |
|
Global Positioning System |
Highway Inventories, Transport Operations, Vehicle Tracking |
|
Precision Odo-Meter |
Distance Measurements |
|
Vehicle Installed Back Lighted Distance Measuring Instrument |
Distance Measurements |
|
Software |
听 |
|
Tranzer Automated Traffic Counting Software |
Traffic counting |
|
CUBE |
Transport Planning |
|
Trans Plan V3 |
Traffic Forecasting, Transport Planning |
- 听




Key Consultancy Projects
Traffic Impact Assessment for Recreational Development along Marine Drive (Wellawatta to Kollupitya). Client: NARA/Ministry of Megapolis and Western Region Development, 2019
Traffic Impact Assessment for Aero-city Development Project. Client: Ministry of Megapolis and Western Development, 2018
Traffic study for Anuradhapura Integrated Urban Development Project for SEC-Greentech JV. Client: Ministry of Megapolis and Wester Region Development, 2018
Evaluation of the Impact on Traffic from Flexi-hours pilot project in Battaramulla area. Client: Ministry of Megapolis and Western Development, 2018
Development of Pricing Formula for Private Fuel Bowser Operators. Client: Ceylon Petroleum Storage Terminals Ltd., 2015
Northern Expressway Feasibility Study: Traffic Surveys and Analysis.听 Client: SMEC International, 2013
2015 Formulation of Criteria for Placement of CEYPETCO New Filling Stations (Phase II):
Updating the methodology developed to identify geographical locations to establish new fuel stations Island wide. Client: Ceylon Petroleum Corporation.
Criteria were developed using population data, distance from existing fuel station, traffic volume, etc. in Phase I and in Phase II is emphasized in updating the system with latest data and introduction of financial biased factors.
2014听听听听听听 Ruwanpura Expressway Feasibility Study:
2014听听听听听听 Environmental Impact Study for the Proposed Industrial Zone Adjacent to the MRMR Port at Hambantota:
Studied transportation (internal and external) demands, logistics, value added services and other services required to establish zoning at MRMR Port Industrial Zone EIA.
Client: Sri Lanka Ports Authority
2013听听听听听听 Evaluation of Impact from Southern Expressway to Galle Road (A2):
Evaluated the impact generated by newly opened Southern Expressway to the Galle Road (A2) 听
Client: ADB, Road Development Authority
2013听听听听听听 Northern Expressway Feasibility Study:
Client: SMEC International, Road Development Authority
2012/听听听听 One-way Road Network Study:
2013听 听 听 听 听 听 听 听 听听Studied in collaboration with Police and recommended to implement a one-way traffic circulation system connecting Maradana Junction-Sangaraja Roundabout and Technical Junction.
2011听听听听听听 Railway Line Electrification Pilot Project:
Economic Feasibility Study for railway line electrification pilot project. Client: Sri Lanka Railways.
Economic analysis was carried out considering costs and benefits of the proposed pilot railway electrification from 鈥淰eyangoda鈥 to 鈥淜aluthara鈥, an 80km section. 听
2011 听听听听听 Formulation of Criteria for Placement of CEYPETCO New Filling Stations:
Development of a methodology to identify geographical locations to establish new fuel stations Island wide. Client: Ceylon Petroleum Corporation.
Criteria were developed using population data, distance from existing fuel station, traffic volume, etc.
2011听听听听听听 Railway Line Extension Project:
Economic Feasibility Study for 鈥淜elani Valley鈥 railway line extension from Horana to Kottawa.
Economic analysis was carried out considering costs and benefits of the proposed development.
Client: Sri Lanka Railways.
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
听
